Say what is production-proven
Every capability number on this site is one we can repeat next month. Where a limit needs review, the page says so.
Company
Shenzhen Betterlink Technology Co., Ltd. has fabricated PCB and assembled electronics in Bao'an, Shenzhen since 2009. The plant is standardised rather than spectacular: imaging, lamination, drilling, plating, wet process, SMT and inspection under one roof, run by people who have done it for a long time.
Who we are · 01
BetterLink started as a PCB fabricator in 2009, building two-layer and multilayer boards for industrial customers in Guangdong. Assembly came later, because customers kept asking the same question: the board is good, but who is going to put the parts on it?
Adding SMT and THT in 2016 changed the shape of the business. Today a typical order starts with a Gerber and a BOM, and ends with a tested, boxed unit on a pallet — fabricated, populated, programmed, inspected and shipped by one schedule.
We are not the cheapest quote in Shenzhen and do not try to be. The value is in the second order: the one where the stack-up is already understood, the panel is already optimised and nothing has to be explained twice.

Factory · 02
Everything on this page was photographed on site. If you want to see a specific process running, ask for a video call and we will walk the floor with a phone.





Milestones · 03
| Year | Milestone | What changed |
|---|---|---|
| 2009 | Founded in Bao'an | Two-layer and multilayer fabrication for domestic industrial customers. |
| 2013 | Surface finish expansion | ENIG, immersion silver and hard gold added; export orders begin. |
| 2016 | PCBA line commissioned | SMT and THT assembly brought in-house so boards ship assembled, not bare. |
| 2019 | HDI and high-frequency | Laser drilling and PTFE/Rogers capability added for RF and module customers. |
| 2022 | Heavy copper and metal base | Power and lighting families added, with cross-section and thermal sampling. |
| 2026 | Turn-key consolidation | Component sourcing, box build and export logistics under one order flow. |
How we work · 04
Every capability number on this site is one we can repeat next month. Where a limit needs review, the page says so.
A price without a date is not a quote. Both arrive together, within 24 hours.
If a lot fails, the lot file says where. We report it, replace it and fix the process — we do not renegotiate the spec.
“The second order is the one that matters. If we have to re-explain the stack-up, we have already lost.”
Engineering team · Bao'an
2nd Floor, Building 6, Zone 8, Xinxing Industrial Park, Xinhe Community, Fuhai Subdistrict, Bao'an District, Shenzhen, China. Factory audits and video walkthroughs are arranged through the quotation desk, usually within two business days.
Quotation
Send a board you already produce elsewhere and compare the DFM note, the price and the date. That is a fairer test than any page on this site.