Quality

Every panel carries its own record.

Three inspection gates, five measurement methods and a lot file that travels with the boards. If a question arrives six months after delivery, the answer is in the file rather than in someone's memory.

ISO 9001ISO 14001IATF 16949ULRoHS / REACHIPC-A-600 / IPC-A-610

Inspection gates · 01

Three gates, no silent rework.

A panel that fails a gate is quarantined and dispositioned. It is not reworked into the shipment without a record and, where the customer requires it, an approval.

01 · IQC

Incoming inspection

Laminate, copper foil, solder mask, prepreg, components. Thickness, Tg, copper weight and supplier lot are checked against the order before release to production.

02 · IPQC

In-process control

First-article at every process step, then patrol inspection at imaging, lamination, drilling, plating, mask and finish. Out-of-window panels are held, not reworked quietly.

03 · OQC

Outgoing inspection

Final visual, dimensional and electrical check against the drawing, plus the inspection record. The lot ships with its test data, cross-section and coupon result.

Automated optical inspection head scanning a panel of finished boards
AOI · inner and outer layer defects
Automated optical inspection machines in the final inspection room
Final inspection room · OQC

Inspection data is filed against the lot number, so a question six months after delivery is answered from a record rather than a memory.

Measurement · 02

What we actually measure.

Inspection equipment only matters if the result is recorded against the lot. Each method below produces data that is filed with the shipment, not just a pass stamp.

Inspection and test equipment
Automated optical inspection (AOI)Inner and outer layer defects, mask and legend
X-ray inspectionBGA voiding, QFN and CSP solder joints
Flying probe100% netlist continuity and isolation
Impedance TDRCoupon measurement on controlled-impedance designs
Cross-section labPlating thickness, annular ring, via integrity
Ionic contamination testResidue after wet process and assembly cleaning
Thermal shock / cyclingReliability sampling on heavy copper and metal base
Solderability testFinish verification and shelf-life checks
Optical inspection of a finished circuit board under a measurement system

Traceability · 03

From laminate lot to serial number.

Every order carries a lot number from material release to packing. Assembly orders inherit the bare-board lot, then add component lot, paste lot, reflow recipe and test result against each serial.

  • Laminate and prepreg lot recorded at IQC.
  • Process parameters logged per panel batch.
  • Electrical test and coupon data filed per lot.
  • Assembly serial linked to component and paste lots.
  • RMA returns traced to the original lot file.

Certifications · 04

What the certificates cover.

Certificates are only useful when the scope matches the work you are buying. Ask for the current certificate and the scope statement with your RFQ.

01

ISO 9001

Quality management system covering fabrication and assembly.

02

ISO 14001

Environmental management for wet process and waste handling.

03

IATF 16949

Automotive quality system — PPAP and control plan on request.

04

UL

Recognised laminate and finished board marking where specified.

05

RoHS / REACH

Material declarations and compliance statements per shipment.

06

IPC-A-600 / 610

Acceptance criteria agreed at order, Class 2 or Class 3.

Reliability · 05

Sampling, not slogans.

Heavy copper, metal base and rigid-flex builds are sampled for thermal cycling and bend life. The result is a number with a test condition attached — not a claim.

ISO 9001ISO 14001IATF 16949ULRoHS / REACHIPC-A-600 / IPC-A-610
  • Thermal shock, −40 °C to +125 °C, per lot on request.
  • Thermal cycling on aluminium base and heavy copper builds.
  • Bend-cycle testing on dynamic flex and rigid-flex tails.
  • Ionic contamination and cleanliness verification after coating.
  • Solderability check on aged samples from sealed stock.
  • Failure analysis with cross-section and photo report on RMA.

Quotation

Audit the quality system before you commit.

Ask for the certificate scope, a sample lot file and a video walkthrough of the inspection area. We would rather answer those questions before the purchase order than after it.

WhatsApp